The purpose of Atal Mission for Rejuvenation and Urban Transformation (AMRUT) is to ensure that every household has access to a tap with the assured supply of water and a sewerage connection, increase the amenity value of cities by developing greenery and well maintained open spaces (e.g. parks) and reduce pollution by switching to public transport or constructing facilities for non-motorized transport (e.g. walking and cycling). The Priority zone of the Mission is water supply followed by sewerage. Rejuvenation of water bodies, green spaces, and parks are other components. Outcome-based funding is a major feature of AMRUT 2.0. Funding for the projects under AMRUT & AMRUT-2.0 will be shared by the Centre, States/ UTs and ULBs. The AMRUT 1.0 cities of Kerala are Thiruvananthapuram, Kollam, Kochi, Thrissur, Kozhikode and Kannur Corporations, and Alappuzha, Guruvayur and Palakkad Municipalities. All 93 Urban Local Bodies in Kerala are included in AMRUT-2.0 except for the Sewerage and Septage sector, which covers only the ULBs included under AMRUT 1.0.

AMRUT Mission was launched on 1st September 2015.

AMRUT 1 scheme is being implemented in 9 AMRUT Cities: -
  • 6 Corporations (Thiruvananthapuram, Kollam, Kochi, Thrissur, Kozhikode and Kannur) and
  • 3 Municipalities (Alappuzha, Guruvayur and Palakkad).
  • Total Project Outlay/ Approved Project Cost: Rs.2357.69 Cr.
  • Central Assistance for Kerala: 1161.2 Cr.
  • Sanctioned Projects: 1111 (Worth 2386 Cr.) | Completed: 965 | Ongoing: 146
  • Expenditure: 1919.62 (81.42%) 
  • Received 100% Central Assistance 
Activities Under Amrut1 Other Than Projects:
Reforms implementation, Capacity Building, GIS based Master plan (for 9 AMRUT Cities), Local Area Plan (LAP) and Town Planning Scheme (TPS) in certain areas of Thiruvananthapuram Corporation.
Water Supply Sector
  • Total Projects: 217 Nos. (1461.88 Cr.) | Completed: 172 Nos.
  • Expenditure: 1209.29 Cr. (82.72%)
  • Water Treatment Plant: Target- 6 Nos. (265 MLD) | Achieved: 5 Nos. (165 MLD).
  • Water Supply Network: Target – 2,084 Km | Achieved: 1,806 Km.
  • New Water Tap Connections: Target – 83,582 Nos. | Achieved: 50,647 Nos.
  • Water Tanks (OHSR & GLSR): Target: 20 Nos. (365.5 Lakh Litre) | Achieved: 17 Nos. (307.5 Lakh Litre)
Sewerage Sector
  • Total Projects: 152 Nos. (352.31 Cr.) | Completed: 109 Nos.
  • Expenditure: 252.57 Cr. (71.69%)
  • Sewerage Treatment Plant:

o   Target – 9 Nos. (27.7 MLD)- | Achieved: 7 Nos. (14.6 MLD) | Ongoing: 2 Nos. (13.1 MLD)

  •  Septage Treatment Plant:

o   Target – 5 Nos. (320 KLD) | Ongoing-1 (100KLD) | Pending: 4 Nos. (220 KLD)

  • Sewerage Network: Target – 103 Km | Achieved: 75 Km
  • Sewerage Connection: Target – 29,128 Nos. | Achieved: 398 Nos.
Storm Water Drainage
  • Total Projects: 536 Nos. (336.83 Cr.) | Completed: 502 Nos.
  • Expenditure: 289.74 Cr. (86%)
  • Drainage Network: Target – 337 Km | Achieved: 324 Km
  • Water logging points elimination: Target – 1395 Nos. | Achieved: 1320 Nos.
Urban Transport
  • Total Projects: 128 Nos. (189.58 Cr.) | Completed: 109 Nos.
  • Expenditure: 129.40 Cr. (68.26%)
  • Multi-Level Car Parking: Target – 7 Nos. | Achieved: 3 Nos
  • Footpath: Target – 78.13 Km | Achieved: 77.4 Km
  • Cycle Track: Target – 6.59 Km | Achieved: 6.49 Km
  • Foot Over Bridge: Target – 27 Nos. | Achieved: 27 Nos.
  • Skywalk: Target – 1 No. | Achieved: 1 Nos
  • Subway: Target – 1 No. | Achieved: 1 Nos
Green Spaces & Parks
  • Total Projects: 78 Nos. (46.32 Cr.) | Completed: 73 Nos.
  • Expenditure: 38.46 Cr. (83%)
  • Area Development: Target – 70.8 Acre. | Achieved: 68.01 Acre.

AMRUT 2.0 was launched on 1st October 2021 to make cities “Water Secure”.

It is being implemented in all 93 Urban Local Bodies in Kerala.

The projects are taken in 4 sectors: Water Supply (Universal Coverage), Sewage & Septage Management (in 9 AMRUT cities only), Waterbody Rejuvenation, and Green Spaces and Parks.

Total Outlay/ Approved Project Cost: Rs. 3495 Cr.

Approved Central Assistance: Rs. 1374 Cr.

 Project Sanctioned so far (SWAP1&2): 452 (Worth Rs. 2411 Cr.)

SWAP3 projects (Final Tranche):  299 (Worth Rs.1240.35 Cr.) approved by SHPSC and will be submitted to MoHUA by this month.

Total Works: 751 Works (452+299)

Activities Under Amrut 2.0 Other Than Projects:
  • Reforms Implementation: Improving delivery of citizen services, bringing down the cost of delivery, improving financial health, augmenting resources and enhancing transparency.
  • IEC (Information, Education & communication): 
  • Technology Sub-Mission (Promoting Startups): identifying the proven and potential global technologies in the water and sanitation sector. Entrepreneurship/start-ups involved in low-cost indigenous equipment and processes will be encouraged. Start-ups will be selected through a challenge and provided financial assistance.
  • Capacity Building: 
  • GIS Based Master Plan: – for class II towns with population 50,000 to 99,99
  • AMRUT Mitra: – To create sustainable livelihood opportunities for SHG women from the water management projects, foster their skills, raise the community awareness about water conservation & reuse, etc.
  • NUDM (National Urban Digital Mission): – The National Urban Digital Mission (NUDM) is a pilot project under AMRUT 2.0, focused on the online delivery of urban services using shared digital infrastructure across the country. Kerala has been selected for the pilot implementation.
Highlights of AMRUT 2.0
  • Total Outlay:  3495 Cr.
  • Central Assistance: 1374 Cr.
  • Total Projects (SWAP1 & 2): 452 Nos. (2213 Cr.) | Completed: 15 Nos.
Water Supply
  • Total Projects: 156 Nos. (1652.51 Cr.) | Completed- 7 Nos.
  • Expenditure: 225.75 Cr. (13.65%)
  • Water Treatment Plant (New): Target- 7 Nos. (58 MLD)
  • Water Treatment Plant (Augmentation): Target- 4 Nos. (39 MLD)
  • Water Supply Network: Target – 2614.45 Km | Achieved: 792.56 Km.
  • Water Tap Connections:

o   New: Target – 3,86,916 Nos. | Achieved: 56,647 Nos.

o   Replacement: Target – 10,83,925 Nos. | Achieved: 18,281 Nos.

  • Water Tanks (OHSR & GLSR):

o   Target: 35 Nos. (70.07 Million Litre)

Sewerage & Septage
  • Total Projects: 14 Nos. (457.81Cr.) | Awarded: 11 Nos.
  • Expenditure: 9.27 Cr. (2.02%)
  • Sewerage Treatment Plant:

o   New STP: Target – 10 Nos. (62.647 MLD)

o   Augmentation: Target – 1 No. (2 MLD)

o   Sewerage Network: Target – 90.61 Km | Achieved: 1.354 Km

o   Sewerage Connection:

  • Target (New)- 19111 Nos. | Achieved:  0 Nos.
  • Target (Replacement)- Target: 14,058 Nos. | Achieved:  12 Nos.
  • Septage Treatment Plant:

o   New FSTP: Target – 1 No. (1 MLD)

 

Waterbody Rejuvenation

  • Total Projects: 251 Nos. (65.15 Cr.) | Completed: 8 Nos.
  • Expenditure: 6.17 Cr. (9.47%)

 

Micro Water Supply Scheme & ULB projects

  •  Total Projects: 31 Nos. (37.60 Cr.)

 

Parks:

Projects under this sector are proposed under SWAP3 only. It will be submitted to MoHUA for approval soon.

  1.   Progress shown above for AMRUT 2.0 projects is under SWAP-1 & SWAP-2 (Tranche 1&2).
  2.  The SWAP-3 Proposal is ready for submission.